Feederlines on LinkedInFeederlines on TwitterFeederlines on Facebook

News archive

Feederlines involved in project NHL 19-07-2012

Based on the long lasting relationship with the Noordelijke Hogeschool Leeuwarden, Feederlines was asked to participate in a project from the second year students of the shipbuilding division.

Feederlines had to deliver the specifications and wishes for a 13.500 ton deadweight vessel equipped with two cranes, a tweendeck and able to carry more than 600 loaded TEU and as fuel efficient as possible. With the delivered specifications the students were able to design a vessel which should match the requirements of the company.

After a project period of about five months the students presented four different designs to Feederlines. During the presentations the representatives of Feederlines had the opportunity to ask questions and comment the presented designs.

After the presentations a discussion took place between the students and Feederlines about certain criteria of vessels’ design, future Rules and Regulations and points of attention for the students for any future projects.

All in all it was a good learning experience for both students and Feederlines.

Pictures presentation